Nov 3, 2009: Concrete Footer

Concrete footer has been poured.

Now that the footer has been poured, the grade of the land must be shaped to meet building code.  This must be done and inspected before the foundation can begin.  To meet code, the slab level must be a certain height above outside grade level and the land must also slope away from the house at a specified dimension.

Hopefully the grade will be completed and inspected by Wednesday allowing work to continue on the foundation.